Statera Battery Storage - East Claydon

THIS APPLICATION WAS REFUSED BY BUCKINGHAMSHIRE COUNCIL - DECEMBER 2024

Projects connected to Rosefield Solar Farm

Statera's “so called” Green Energy Project was submitted to Buckinghamshire Council on Monday 18 December 2023. The application is for a 500 megawatt (MW) Battery Energy Storage System (BESS) - one of the world's largest, that will be located very close to the existing East Claydon Sub-Station on the outskirts of Granborough.

The Statera battery development will eat up yet more agricultural land and span approximately 10.75 hectares (26.6 acres). An additional 15.49 hectares (38 acres) will be established for landscape and biodiversity enhancement. This will be in addition to the 2,100 acres being used by Rosefield Solar Farm.

We have also since learned in August 2024, that another application made by Statera's partner Statkraft, have applied for a Scoping Opinion to Buckinghamshire Council to be able to add a further 500MW of BESS across the road from the substation. Plus National Grid have also informed us that they are currently applying for planning to build a larger new substation next door to the current site. These details are yet to be submitted but see the map below which shows that the cummulative effect is well under way!

The Battery Energy Storage System will include 515 full sized shipping containers modified to accommodate batteries plus half-sized shipping containers, modified to accommodate the inverters and transformers. The current design of the battery storage facility would provide storage capacity of 500 MW, and is likely to be connected to the Rosefield Solar Farm project.

EQT Infrastructure has agreed to acquire Statera, a UK-based battery storage and flexible generation infrastructure developer and operator.

Because there is no doubt that this scheme is connected to Rosefield Solar Farm, Granborough have joined forces with Claydons Solar Action Group.

Key points & reasons to comment - second phase

There are many and varied opinions on the Statera BESS application. The significant amount of documentation available in the application, together with facts and opinions from various sources make the summary of key points a difficult task.

To enable responses to Buckinghamshire Council on the planning application, a summary of findings has been produced and presented by the Parish Council working Group.

It has already been said that there will be consequences during the two phases of the project, the construction phase and the operational phase.

We know many people have busy lives so in addition, the following summaries are intended to help residents write their comments to the Council. Please use your own words and feel free to add your own comments.

If you sent your comments during the first round please feel free to use them again if appropriate and perhaps adapt it accordingly.

We simply must not let this continue. To object please click on the link below:

To access the ‘comments’ page please click on the above link, go down to ‘comments’ and click on it. You will need to log in with your username and password. Once logged in click on 'make a comment'. The rest is obvious but do remember to click on commenter type or you will get an error message. If you cannot log in you will need to register so click on register and go through the motions - it’s an easy process. THANK YOU in advance !

BE QUICK! DEADLINE - Thursday 19th September 2024, 11.59pm

The Construction & Enabling Phase topics

  1. Traffic and Transport
  2. Landscape and Visual
  3. Archaeology
  4. The Environment and Climate Change
  5. Land Use

The Operational Phase topics

  1. Landscape and Visual
  2. Fire Safety and Contamination Risks
  3. Climate Change
  4. Land Use

Summaries

Below are points of concern for the second phase of proposals.

CUMULATIVE EFFECT
  • The cumulative effect of Statera BESS, Statkraft BESS, the larger new East Claydon substation and Rosefield Solar Farm will be enormous and dominate and change the landscape of the entire area.
  • Statera BESS 500MW and now Statkraft 500MW are in partnership with each other. Why do we need both? Plus Rosefield will have their own BESS units too.
SIZE REDUCTION
  • Reducing the size of the proposed site by one field will make a negligible impact on an already large proposal.
  • Using the latest technology allows the number of battery storage units to be reduced but still hold 500MW. This rapid progression between the initial proposal and current technology highlights the pace of innovation.
  • By the time the new and much larger East Claydon substation is ready in 2030, it's highly likely that battery storage, renewable energy generation, and grid integration technologies will have evolved even further, potentially making the original design outdated, inefficient or even redundant.
WATER COURSES/FLOODING ISSUES
  • Nothing has been mentioned to address the flooding issue.
  • Disposal of stormwater has not been addressed.
FIRE HAZARDS
  • Fire hazards - they have provided a lot of information but nothing substantial enough to make it clear.
  • The large shipping containers are changing and changing rapidly. New accessible units are coming from China. Although they contain batteries temperature and gas sensors, sprinkler systems, warning systems and cooling systems, there would need to be more significant requirements regarding access and water accessibility.
  • As far as we are aware there are currently no UK standards or regulations for these. Clearly these need to be ‘managed’ and engineering expertise will be needed to make independent judgements on behalf of the planning authorities. Until the government take responsibility for clear standards and regulations, both BESS and Solar applications should be halted.
  • Although units may be the latest technology, there is always the possibility of a fire and this has not been addressed properly. Testing of BESS facilities will not guarantee zero risk of hazardous fires.
  • If a fire does occur there would be insufficient water available.
  • Removal of contaminated water has not been addressed.
  • What guarantees are there that the brook will NEVER get polluted?
  • Tests on the water and land need to be carried out well in advance so that there is a record of what we have currently.
  • Toxic fumes will be extremely dangerous in neighbouring villages depending on the prevailing winds at the time. This WILL affect either Granborough, Winslow, East Claydon, Botolph Claydon and Hogshaw. There is no detail about how any smoke or fumes will be managed.
VISUAL AMENITY
  • Predicted changes to views have still not been addressed sufficiently and will still be clearly seen/heard both during construction and afterwards.
NOISE
  • The confirmation of a constant hum from Statera raises legitimate concerns about noise disturbance for nearby residents, walkers, and wildlife, particularly during quieter times when ambient noise levels drop.
WILDLIFE SURVEY
  • A wildlife survey for just one day on 12th February 2024 for 4 hours is clearly not enough for surveying birds and wildlife and should be carried out at different times of the year.
CONSTRUCTION PHASE
  • During construction, there WILL be a lot of disruption to all the villages/Winslow around the proposed site/s. After seeing how HS2 operate we all know that although there may be stipulations to when construction can take place, we know that these rules will be broken.
  • Very large lorries with shipping containers, and other construction traffic will be a constant nuisance to all areas affecting Granborough, Winslow, The Claydons, Quainton and beyond.
PROFITEERING
  • This is purely an exercise for the multi-national Energy companies to make huge profits. It is a gold rush. Only the energy companies and landowners will benefit.
  • What benefits will there be for the communities?
  • Do we really need this and the other sites?
  • Why so big?
  • What are the Government targets and how much renewable energy is already in the pipeline? Does ANYONE know?

 

Below are points of concern raised in the first phase of the proposals.

Traffic and Transport

  • During construction, the number of daily two-way construction vehicle movements associated with the application site is estimated to be 21,500 vehicle movements - approximately half (10,750) will be HGV’s coming from Buckingham through Padbury and into Winslow. These volumes of traffic will continue for at least 18 months and expose the residents to continuous daily noise and air pollution and safety risks to pedestrians, cyclists and horse riders. Such large traffic volumes will require traffic management systems which will inevitably cause delays and disturbance that will have a negative effect on the daily lives of residents.
  • The construction will cause damage and disruption by intensive, heavy traffic to country and village roads. They will enter Winslow from the Padbury side, down the High Street turning right onto Vicarage Road, left onto Burley’s Road and continuing down the hill onto Granborough Road before exiting Winslow.
  • In addition, there will be “Abnormal Indivisible Loads” (AILs) for which street furniture in Winslow will need to be taken down as these loads are so wide and heavy.
  • There would be a significant risk to public safety for the residents of Winslow and Granborough. HGV’s will need to go through Winslow’s residential roads where there is already on-street parking. The roads are not suitable to accommodate HGV’s.
  • Routing through Granborough via the old bridge is not designed for HGV traffic and will pose a very significant danger.  Horse lovers use these roads regularly and this would pose a danger for them.
  • Additionally, should the main construction route be blocked ‘for whatever reason’ this route will also be used as access for all construction traffic.

 

Landscape and Visual

  • The most significant landscape and visual effects arising from the construction process will be moving vehicles and machinery, delivery traffic and crane jibs used to lift the equipment into place.
  • The construction activities, stockpiled materials, moving machinery and delivery vehicles will be visible from day one, and the rural landscape and open views from houses and footpaths will be destroyed and never recover.
  • The industrialisation of rural countryside and loss of agricultural land will cause a permanent adverse impact on ecology and a loss of natural habitats for wildlife. This land will be permanently lost for food production.

 

Land Use

  • Loss of agricultural land. This farmland will be lost to industrialisation for at least 40 years. Any assumption that this can be reversed when the project reaches its end of life is totally without foundation. The land will be very damaged and beyond recovery.
  • The land, although having been graded 3b, is still productive agricultural land. As there are good levels of water retention on this site, with more dry weather, this can only be good for our crops, necessary for our food security which is already being threatened. Using perfectly good agricultural land for the purpose of a huge BESS site is unacceptable.

 

Archaeology

  • The proposed development will have an adverse effect upon the significant prehistoric remains and associated features relating to settlement and the agricultural management of the landscape. The proposals will also have an adverse effect upon the significant Roman remains, cut features and finds of the period. The proposal will also have a minor adverse effect on those remains of medium significance, including prehistoric remains and cut features relating to settlement and agricultural use of the landscape, and Roman cut features and finds.

 

The Environment and Climate Change

  • The BESS has been presented as being ‘green’ which is disingenuous. The site will only store energy taken from the grid at off-peak times to sell it back at peak times. The majority of this energy will come from traditional carbon heavy sources. It will not contribute new green energy to the grid.
  • According to Statera’s application documents, this project could actually increase greenhouse gas emissions. The manufacturing of the battery packs would result in supply chain emissions of up to 1,083,320 tonnes carbon dioxide equivalent (tCO2e)
  • There will be a permanent adverse impact on ecology and loss of natural habitats for wildlife.

 

Fire Safety and Contamination Risks

  • Each BESS container will contain thousands if not millions of lithium based rechargeable cells. It is well known for this type of battery to catch fire, primarily due to thermal runaway, and can happen very quickly. Lithium battery fires are particularly difficult to control because during combustion they generate their own oxygen, and can spontaneously re-ignite sometimes hours after apparently been extinguished. For this reason copious amounts of water are very often required to control and finally extinguish a fire.
  • Fires can result in the ejection of a range of flammable and toxic gases which can either ignite immediately or spread out un-ignited until an external ignition source is encountered, resulting in an explosion. There could be a wide area affected by toxic and potentially explosive gasses in a large area downwind of any fire. With prevailing SW or NW winds this could affect Winslow town or Granborough village.
  • The addition of an access point from East Claydon Road on a temporary basis during construction.
  • The unacceptable risks of fire, explosion, and water pollution, and the catastrophic consequences on the local area and on the health and wellbeing of residents cannot be mitigated.
  • Once constructed and in operation, the only access to the site will be from Hogshaw Road. Access for fire appliances is poor and fire appliances would need to negotiate Winslow town, the single track humped bridge into Granborough, through the village and finally enter the single track Hogshaw Road in order to reach the scene of the fire. This is totally inadequate. It does not satisfy the fire authorities requirement for two distinct access points for fire appliances during the lifetime of the development.

 

Cumulative Effect

  • The cumulative effect has been vastly overlooked by the promoters of the project, yet again demonstrating a severe lack of foresight and understanding of the local area. Communities have suffered needlessly day in and day out for years with the impact of HS2 and EW rail projects and have taken far more than their fair share of the burden for large-scale projects that will do nothing to benefit them.

 

Danger to Public Health

  • There is a potential for harmful waste water being used to extinguish fires, running into Claydon Brook. Salt water would be better to be used which is why BESS sites should be located on industrial sites close to the coast where there is an adequate supply of salt water.  Fire and contamination risks show that these significant projects should be located in coastal or desert areas.
  • There is a significant health risk due to fluoride gas emissions, particularly due to there being a statistical certainty that multiple fires will occur with the lifespan of the project. Fires can produce toxic vapour clouds where so far, there has been no evidence of this being a risk either way but could mean a cause for respiratory health issues.
  • As this applicant hasn’t provided a mitigation strategy it would not be deemed safe to be constructed or operated.
  • Due to the extent of any fire at this location, responses will need to immediately be available to extinguish and contain toxic waste. There is just one engine station based in Winslow. There are 3 other stations but all of these will not be enough to deal with BESS fires with an immediate response.
  • The site plan doesn’t provide emergency vehicle access to all containers.  Being just one access point via Hogshaw Road, it would be an extra 2 miles added to the route with more delays to the site.
  • With the site being located within metres of an international light aircraft landing strip at Hollow Hill Farm this would not be an acceptable location as it would present too much risk for aircraft when taking off and landing.
  • I would imagine that with the size of this site, possible number of fires and contamination, it would be questionable if this would actually be insurable.  It would need a very large amount of PLI to cover them.

 

Possible target for sabotage / terrorist activity

  • This type of facility would be cause for a considerable security threat being a national target.

 

The need versus money making exercise

  • According to this proposal there will be more carbon emissions being created than carbon benefits gained, being up to 1,083,320 tC02e (tonnes of carbon dioxide equivalent) from the battery packs.
  • It has been confirmed by the National Grid’s future energy Scenarios report of 2022, that the UK requires 20,000MW of battery storage by 2030 and 35,000 MW by 2050 in order to deliver against its Net Zero plans.
  • The latest report by Renewable UK shows that the total pipeline of battery projects has increased to 85,000 MW in the last year!  According to the UK’s Energy & Climate Intelligence unit ‘The UK’s capacity (Including the consented projects) already exceeds National Grid’s expectations for battery storage capacity for 2023!
  • Taking this very much into consideration, the proposal would make little or no difference to the UK’s ability to reach its storage targets for both 2030 and 2050.
  • This shows how much this proposal is all about a very large money-making scheme and something that should be discounted immediately.

 

Detrimental effects on wildlife

  • As per the BBOWT comments, although the applicant has included measures to include biodiversity, this would cause a detrimental effect on wildlife including illumination of protected bats and needs the right amount of lighting to meet H&S requirements. Due to mammals on site, gates would need to be erected but this would further provide a further security threat.

 

General

  • The planned development of the Statera BESS does not comply with the VALP or the neighbourhood plans of the surrounding villages. It will have an unacceptable impact on the local environment and communities. It offers no real or fair benefit for the local communities affected by its construction and operation that offsets its immense impact on communities and the environment. Many local roads are totally unsuitable to carry the large and heavy equipment needed to construct and service this site.
  • There can be no justification for developments of this nature on agricultural or greenfield sites. The UK is already on track to meet its battery storage requirements, with numerous sites already in operation and several more already approved and thus this development is simply not required.
  • It is too big and too close to the village of Granborough whose residents will suffer the extreme consequences of a massive infrastructure development near to a rural village. The size of the installation will dominate the small village of Granborough and adversely affect the benefits of living in a rural community.
  • The most significant landscape and visual effects arising from the construction process will be moving vehicles and machinery, delivery traffic and crane jibs used to lift the equipment into place. There will be vehicle fumes and noise pollution throughout the whole process. This project will cause destruction of lifestyle amenity in a village community, and destruction of the local the environment.
  • When operational the 40 year lifetime of this project will have destroyed landscape and open views from houses and footpaths. The maturity of any landscaping measures is a long process and is unlikely to be adequate for at least 10 years. When operational, there will be noise and air pollution from cooling fans, transformers, inverters and other equipment for 24 hours a day. This will have an adverse effect on human health and wellbeing.
  • There are no benefits and many adverse effects for local residents and their community.
  • It is impossible to ignore the consequences of the decommissioning process, including HGV traffic volumes for removal of all installations, the risk of no real land recovery, and the insecurity of a battery recycling process.
  • Along with a possible Rosefield Solar Farm, the BESS will forever desecrate the countryside in which Granborough and other effected villages sit. It is very unlikely to be returned to fields after the 40 year lifespan of the BESS and as Statera admit, the land will be very damaged.